Integrated Marine Informations System - IMIS

Personen | Instituten | Publicaties | Projecten | Datasets | Kaarten
[ meld een fout in dit record ]mandje (0): toevoegen | toon Print deze pagina

The Westerschelde Tunnel project
Vanhoucke, M. (2012). The Westerschelde Tunnel project, in: Vanhoucke, M. Project management with dynamic scheduling - Baseline scheduling, risk analysis and project control. pp. 173-183. http://dx.doi.org/10.1007/978-3-642-25175-7_9

Beschikbaar in  Auteur 

Auteur  Top 
  • Vanhoucke, M.

Abstract
    This chapter presents a real-life project example where the minimization of a bottleneck resource’s idle time is the scheduling objective. The project is an illustration of a project scheduling problem with a work continuity scheduling objective as discussed in Sect. 8.2.1. The chapter illustrates that the use of dedicated scheduling algorithms can lead to improvements in the cost outline of the schedule. Various parts of this chapter have been published in Vanhoucke (2006b, 2007).

Alle informatie in het Integrated Marine Information System (IMIS) valt onder het VLIZ Privacy beleid Top | Auteur